top of page
Construction & Home Builds
1st fix: Anything during the construction and before plastering. Stud walls, floor joists, ceilings, roof struts, door frames etc.
2nd fix: Finishing touches, generally after plastering. Door hanging, skirting, architrave, flooring etc.
Say Hello

HOW TO enquire
Get in touch directly or use the form.
LEAD TIMES
Everything is made to order. Lead times can vary from 1–5 weeks, depending on the piece and our current production demand. Give us a shout for our most up to date lead times.
Call: 07947 758 757
Email: hello@dbtcarpentry.co.uk
Designed & maintained by Niamh McClymont
bottom of page
