top of page
Construction & Home Builds
1st fix: Anything during the construction and before plastering. Stud walls, floor joists, ceilings, roof struts, door frames etc.
2nd fix: Finishing touches, generally after plastering. Door hanging, skirting, architrave, flooring etc.
Here is a perfect example of a Birch Plywood Kitchen with epic red Formica worktop. Proper fun build this was. AND! Look at those handles. Those are the signature details that comes with Stratum Designs, the other half of me.
Thank you to Nettle for the commission. Loved the job, more please!
Penryn, Cornwall
bottom of page