top of page
Construction & Home Builds
1st fix: Anything during the construction and before plastering. Stud walls, floor joists, ceilings, roof struts, door frames etc.
​
2nd fix: Finishing touches, generally after plastering. Door hanging, skirting, architrave, flooring etc.
An alcove unit with chunky cubbie holes. All built and painted for the client making sure it was fully integrated to the alcove opening. Moisture resistant MDF was used and painted whereas the insides of the cupboards were made from Birch Plywood.
Alcove 'Cubbies'​​



bottom of page


