top of page
Construction & Home Builds
1st fix: Anything during the construction and before plastering. Stud walls, floor joists, ceilings, roof struts, door frames etc.
2nd fix: Finishing touches, generally after plastering. Door hanging, skirting, architrave, flooring etc.
Van bed / desk / double dog cage! I built this for Abbie, a local mutt behaviourist. She wanted to done quick, cheap and sturdy. That’s what she got. It doesn’t have to always be about high end cabinetry!
The dog van





bottom of page
