Construction & Home Builds
1st fix: Anything during the construction and before plastering. Stud walls, floor joists, ceilings, roof struts, door frames etc.
​
2nd fix: Finishing touches, generally after plastering. Door hanging, skirting, architrave, flooring etc.
An extremely functional yet beautiful boot room for our clients in Stithians, Cornwall. We built them a full wall of cubbie holes, hanging space as well as boot and shoe racks. A large cupboard for all those extras as well as a sink unit with 4 internal cupboards. Oh and an area for the washing machine and tumble dryer. All brought together through our matching Modern Marquetry handles, upstands and stripe across the bench seat.
​
Modern Marquetry specifics: A cross grain Ash substrate with recycled CDs, reclaimed timbers and plastics.
​
Materials: A mixture of solid Oak and Birch Plywood.
​
Finish: A hard-wearing spray finish lacquer coats everything, allowing it to be wiped clean.
Boot Room
​





