Construction & Home Builds
1st fix: Anything during the construction and before plastering. Stud walls, floor joists, ceilings, roof struts, door frames etc.
2nd fix: Finishing touches, generally after plastering. Door hanging, skirting, architrave, flooring etc.
An extremely functional yet beautiful boot room for our clients in Stithians, Cornwall. We built them a full wall of cubbie holes, hanging space as well as boot and shoe racks. A large cupboard for all those extras as well as a sink unit with 4 internal cupboards. Oh and an area for the washing machine and tumble dryer. All brought together through our matching Modern Marquetry handles, upstands and stripe across the bench seat.
Modern Marquetry specifics: A cross grain Ash substrate with recycled CDs, reclaimed timbers and plastics.
Materials: A mixture of solid Oak and Birch Plywood.
Finish: A hard-wearing spray finish lacquer coats everything, allowing it to be wiped clean.
Boot Room






